Calculators · Consulting
Condensation & dew-point checker
Glaser method · surface & interstitial risk
Build up the construction and set the conditions. We run the temperature and vapour-pressure profile through the wall and flag where it crosses the dew point, the first-pass screen before a full WUFI analysis.
Build-up & conditions
A steady-state Glaser screen, not a WUFI result. It ignores moisture storage, rain, summer drying and built-in moisture. Use it to flag risk, not to clear a detail for construction.
How the screen works
- Temperature falls across each layer in proportion to its thermal resistance
R = d/λ. - Vapour pressure falls in proportion to each layer’s vapour resistance
s_d = μ × d(a vapour control layer adds a large s_d). - At every interface we compare the vapour pressure to the saturation pressure at that temperature. Where vapour pressure would exceed saturation, condensation is predicted.
- Surface mould risk uses
f_Rsi = (T_si − T_e) / (T_i − T_e), checked against0.75.
Why trust it: it follows EN ISO 13788. For anything marginal we model it transiently in WUFI, and every detail is reviewed by one of our 7 accredited Passivhaus certifiers.
Take it further
Marginal? Get it modelled transiently.
Glaser is a screen. When a detail is close, or there is a vapour-open build-up, retrofit, or built-in moisture, we run it in WUFI over a full year to see if it dries. Send us the build-up.